Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 25 results ...

Adinyira, E, Manu, P, Agyekum, K, Mahamadu, A and Olomolaiye, P O (2020) Violent behaviour on construction sites: structural equation modelling of its impact on unsafe behaviour using partial least squares. Engineering, Construction and Architectural Management, 27(10), 3363–93.

Aghimien, D O, Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations – a Delphi study. Engineering, Construction and Architectural Management, 27(10), 3171–88.

Ahiaga-Dagbui, D D, Tokede, O, Morrison, J and Chirnside, A (2020) Building high-performing and integrated project teams. Engineering, Construction and Architectural Management, 27(10), 3341–61.

Alleman, D and Lee, E (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), 2859–91.

Arbabi, H, Salehi-Taleshi, M and Ghods, K (2020) The role of project management office in developing knowledge management infrastructure. Engineering, Construction and Architectural Management, 27(10), 3261–87.

  • Type: Journal Article
  • Keywords: Project management office; Knowledge management; Knowledge management infrastructure; Project-based organization; Oil and gas upstream industry;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-11-2019-0600
  • Abstract:
    Knowledge management (KM) is regarded as an essential factor in project-based organizations (PBOs), leading to organizational learning across projects. Over recent years, most PBOs have inserted project management offices (PMOs) into their hierarchical charts to manage their projects much more coherently. These offices can correspondingly provide KM facilities in PBOs. Thus, this study aimed to analyze the relationship between PMO functions and KM infrastructure, as KM enablers in organizations, in Iranian oil and gas upstream PBOs.Design/methodology/approach A two-phase quantitative survey strategy was exercised in this research. The first phase was to investigate the relationship between PMOs and KM infrastructure and to prioritize PMO functions and KM infrastructure based on their existing implementation/establishment status in Iranian oil and gas upstream PBOs. The research participants, identified through the website of the National Iran Oil Company (NIOC), were comprised of 46 oil and gas upstream PBOs which applied for exploration and production (E&P) certificate in Iran in 2016 and 2017. Accordingly, a total number of 46 questionnaires were submitted to the aforementioned companies with a return rate of 41 cases. The second phase was fulfilled questioning 19 Iranian oil and gas industry experts to determine the one-to-one effect of PMO functions on KM infrastructure and to verify the first-phase results.Findings The results indicated a strong relationship between PMO functions and KM infrastructure. This relationship was significant with regard to “practice management” and “technical support”, having the most considerable connections with KM infrastructure. According to the first-phase results, the main functions of PMOs in Iranian oil and gas industry were “practice management” and “technical support”. Considering KM infrastructure, “structure” showed the lowest mean value while “culture”, “human resources” and “processes and procedures” obtained the highest scores. The results also demonstrated that PMO functions could lead to more improvements in “processes and procedures”, as a sub-component of KM infrastructure, compared with other sub-components. Furthermore, the oil and gas industry experts believed that “organizational culture” in KM could be shaped by most of PMO functions.Originality/value This study fulfilled the need for exploring the relationship between PMO functions and KM since academic literature lacked a thorough investigation, to the best of authors' knowledge, pertaining to the effects of PMO functions on KM development in oil and gas PBOs.

Bevan, W, Lu, S and Sexton, M (2020) Skills required to deliver energy efficient school retrofit buildings. Engineering, Construction and Architectural Management, 27(10), 3051–73.

Huynh, T T, Dang, C N, Le-Hoai, L, Pham, A and Nguyen, T D (2020) Proposing a strategy map for coastal urban project success using the balanced scorecard method. Engineering, Construction and Architectural Management, 27(10), 2993–3030.

Irfan, M, Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), 3135–53.

Kim, S Y, Nguyen, M V and Luu, V T (2020) A performance evaluation framework for construction and demolition waste management: stakeholder perspectives. Engineering, Construction and Architectural Management, 27(10), 3189–213.

Lin, Y, Guo, Y, Kim, C, Chen, P and Qian, M (2020) The impact of relational governance on the adaptability of international contractors: a comparative study between China and Korea. Engineering, Construction and Architectural Management, 27(10), 3235–59.

Liu, B, Xue, B, Meng, J, Chen, X and Sun, T (2020) How project management practices lead to infrastructure sustainable success: an empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), 2797–833.

Loosemore, M, Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), 3075–93.

Olanrewaju, O I, Chileshe, N, Babarinde, S A and Sandanayake, M (2020) Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), 2931–58.

Oshodi, O, Edwards, D J, lam, K C, Olanipekun, A O and Aigbavboa, C O (2020) Construction output modelling: a systematic review. Engineering, Construction and Architectural Management, 27(10), 2959–91.

Song, Z, Yang, F, Boezeman, E J and Li, X (2020) Do new-generation construction professionals be provided what they desire at work? A study on work values and supplies–values fit. Engineering, Construction and Architectural Management, 27(10), 2835–58.

Sun, C, Xu, H and Jiang, S (2020) Understanding the risk factors of BIM technology implementation in the construction industry: an interpretive structural modeling (ISM) approach. Engineering, Construction and Architectural Management, 27(10), 3289–308.

Sun, M, Zhu, F and Sun, X (2020) Influencing factors of construction professionals’ burnout in China: a sequential mixed-method approach. Engineering, Construction and Architectural Management, 27(10), 3215–33.

Türkakın, O H, Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), 2893–909.

Tong, R, Zhang, N, Wang, X and Zhao, H (2020) Impact of safety management system on safety performance: the mediating role of safety responsibility. Engineering, Construction and Architectural Management, 27(10), 3155–70.

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: the case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), 3395–414.

Wang, Y, Ye, G, Zhang, Y, Mu, P and Wang, H (2020) Total factor productivity growth and its contribution: lessons from the Chinese construction industry pre- and post-2008 financial crisis. Engineering, Construction and Architectural Management, 27(10), 2911–29.

Zhang, L, Dai, G, Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), 3095–113.

Zhang, N, Hwang, B, Deng, X and Tay, F (2020) Collaborative contracting in the Singapore construction industry: current status, major barriers and best solutions. Engineering, Construction and Architectural Management, 27(10), 3115–33.

Zhang, Q, Chong, H, Liao, P and Wan, Y (2020) Logistic regression modeling of implementation of corporate safety policy in international infrastructures. Engineering, Construction and Architectural Management, 27(10), 3031–50.

Zhang, Y, Luo, W, Shan, M, Pan, D and Mu, W (2020) Systematic analysis of PPP research in construction journals: from 2009 to 2019. Engineering, Construction and Architectural Management, 27(10), 3309–39.